Once the drip emitters, irrigation heads, and irrigation lines have been placed in the drawing, as required, irrigation plans are created by using the ID Label tool and worksheets together.
2. Select the ID label type and style. Place ID labels on the drawing with the ID Label tool. (See ID Label Tool.)
3. From the Resource Browser, open the Libraries\Defaults\Reports~Schedules\Irrigation Reports.vwx file that is included with Landmark. Drag the Irrigation Head Schedule or Irrigation Line Schedule worksheet to the drawing. An Irrigation Schedule worksheet, populated with information from the irrigation in the current drawing, is automatically created. For more information on worksheets, see Worksheets.
| Nemetschek NA |
| Phone: 410.290.5114 |
| Fax: 410.290.8050 |